+607 509 5995
Conclusion:
Solar kWp generation & distribution remain consistent @300kWp per day (assume dependent variable factor are constant).
Due to inefficiency, the 300kWp generation can only being transmitted to 2 units of AHU
The oter AHU units will depend on grid supply (TNB). Thus, it will increase overall TNB bills.
An installation of PFCS will correct the power factor at incoming and outgoing levels consequently increase a distribution capacity and reduce TNB bills by 20-30%
© All Rights Reserved.