fbpx

No 23, Jalan SiLC 2/3 Kawasan Perindustrian SILC, 79200 Iskandar Puteri, Johor

Maintain Sustainable Power Factor 0.96-0.98 in the Long Run

Before PFCS = May 2023

After PFCS = June 2023 - March 2024

June 2023
July 2023
August 2023
September 2023
October 2023
November 2023
December 2023
January 2024
February 2024
March 2024
Previous slide
Next slide

Analysis Bill

Edit Content

Before PFCS - March 2023

After PFCS = March - April 2024

Previous slide
Next slide

Overall Analysis for 19 month Duration

Claim & Saving Justification

Edit Content

Before PFCS - Dec 2023

After PFCS = Jan 2024 - March 2024

Jan 2024
Feb 2024
March 24
Previous slide
Next slide

Overall Analysis for Food Processing Factory & Chain Supermarket

Saving Justification

Edit Content

Before PFCS

After PFCS = Dec 2023 - Jan 2024

Previous slide
Next slide

Overall Bill Analysis

Saving Justification

Edit Content

Before PFCS

After PFCS

Overall Bill Analysis

Saving Justification

Edit Content

Before PFCS

After PFCS

Objectives

01

Provide a support system for main reactive power line.

02

Reduce reactive proportion on grid by installing PFCS at 44 units of AHU ranging between 30 HP- 50 HP.

03

Increase distribution capacity by restoring reactive power (kVarh) which unuseful to the load.

04

Prolong an asset lifespan by preventing power loss on grid


05

Reduce the 3 main components of energy starting with kVarh (reactive), kVah (apparent) that lead to the reduction of kWh (active) due to the usage efficiency.

06

Helping optimum conversion (up to 100% capacity) of kWp (solar) from DC to AC.