No 23, Jalan SiLC 2/3 Kawasan Perindustrian SILC, 79200 Iskandar Puteri, Johor

Maintain Sustainable Power Factor 0.96-0.98 in the Long Run

Before PFCS = May 2023

After PFCS = June 2023 - March 2024

June 2023
July 2023
August 2023
September 2023
October 2023
November 2023
December 2023
January 2024
February 2024
March 2024

Analysis Bill

Edit Content

Before PFCS - March 2023

After PFCS = March - April 2024

Overall Analysis for 19 month Duration

Claim & Saving Justification

Edit Content

Before PFCS - Dec 2023

After PFCS = Jan 2024 - March 2024

Jan 2024
Feb 2024
March 24

Overall Analysis for Food Processing Factory & Chain Supermarket

Saving Justification

Edit Content

Before PFCS

After PFCS = Dec 2023 - Jan 2024

Overall Bill Analysis

Saving Justification

Edit Content

Before PFCS

After PFCS

Overall Bill Analysis

Saving Justification

Edit Content

Before PFCS

After PFCS

Objectives

01

Provide a support system for main reactive power line.

02

Reduce reactive proportion on grid by installing PFCS at 44 units of AHU ranging between 30 HP- 50 HP.

03

Increase distribution capacity by restoring reactive power (kVarh) which unuseful to the load.

04

Prolong an asset lifespan by preventing power loss on grid


05

Reduce the 3 main components of energy starting with kVarh (reactive), kVah (apparent) that lead to the reduction of kWh (active) due to the usage efficiency.

06

Helping optimum conversion (up to 100% capacity) of kWp (solar) from DC to AC.


Data Logging Power Analyzer Before Installation PFCS

© 2025 All Rights Reserved.